About Our New Construction Exteriors Service
Tri-State Roofing and Chimneys installs the exterior on new homes and additions across New Jersey: new construction roofing, siding, brick veneer and masonry, chimneys and gutters, done by one crew so the joints between trades go together in the right order. Water gets into a new exterior where one trade hands off to the next: roof to wall, wall to brick, chimney to roof. We are not the builder. On a new home we work under the registered builder; on an addition, under whoever runs the job, whether that's a general contractor or you acting as your own. Tri-State is family-owned, a GAF Certified Contractor for roofing, and insured for general liability and workers' compensation, with 12+ years of experience.
Where the Trades Meet: The Joints That Decide Whether It Leaks
A new exterior is most exposed at its joints, and each joint depends on layers going on in an order that can't be undone once the next layer covers them:
- Roof against a wall: base flashing at least 4 inches up and 4 inches onto the roof, its vertical leg continuous under the siding. Code allows step or continuous flashing; in practice a sloped sidewall gets step flashing woven into each shingle course, and a wall above the top of a roof plane gets a continuous apron. Flashing first, siding after.
- Eave against a sidewall: a corrosion-resistant metal diverter, usually called a kickout. Without it, water running down the step flashing can run behind the siding and into the wall.
- Roof against brick: the roofer's step flashing goes on first. On new veneer the mason lays counterflashing into the mortar joints as the brick rises, lapping down over it; on existing brick it goes into a groove cut in a mortar joint. Caulk on the brick face is not counterflashing.
- Shingle roof edges: drip edge at eaves and rakes, underlayment over it at the eaves and under it at the rakes, pieces overlapped at least 2 inches.
- Walls: a continuous water-resistive barrier behind all cladding, flashing lapped shingle-fashion, upper over lower.
When the roofer and the sider are different companies, the roof-to-wall joint becomes a hand-off: the roofer can't step-flash a wall that's already sided, and the sider can't lap wrap over flashing that isn't there yet.
A missing kickout leaves a pattern: streaks on the siding, and swollen trim or soft sheathing, just below where a lower eave meets a wall. That's a missing kickout, not a shingle problem.
How an Addition Roof Ties Into an Older North Jersey House
An addition roof ties into an older house in three steps: confirm the slope allows shingles, lift the existing shingles along the joint so new underlayment and flashing weave in, and line the valleys before shingling. Asphalt shingles need a 2:12 pitch or steeper, with double underlayment up to 4:12. Some rear additions and porch roofs on post-war capes and two-families are framed shallower and need low-slope membrane roofing.
Every lap at the tie-in runs upper piece over lower; reverse one and water running down the roof is fed straight under it. Aged shingles crack when lifted, especially in cold weather, so a strip of the old roof often gets replaced along the joint, and an existing two-layer roof has to be stripped back along the joint before new work can be woven in.
New shingles won't match a roof that has weathered and shed granules, and the difference may never fully go away. You can accept it, re-roof the plane the addition joins, or replace the whole roof at the same time.
Siding is harder to match. Pull a piece from a hidden spot to identify the profile and exposure, because the right color with the wrong reveal looks wrong from the street. Siding salvaged from the wall the addition covers has the same fade and can patch the most visible side; new siding goes on the addition, with the change placed at an outside corner. Panel options are on our vinyl siding page.
Measure the existing chimney before the design is final. It must end at least 2 feet above any part of the building within 10 feet, so a new dormer or second story nearby can leave it too short to meet code. Extending it is chimney rebuild work, easier to plan on drawings than after framing.
Where an upper roof drains onto the addition, pipe its leader to the lower gutter or to grade, not onto new shingles, and discharge every leader away from the addition's backfill, which settles after construction.
Brick Fronts on New Builds: Flashing First, and Winter Rules
A brick front on a new house stays dry because of what goes in before the brick: a water-resistive barrier, an air space, nominally 1 inch with typical ties, and flashing with weepholes at the base, floor lines, lintels and shelf angles. That's why the brick belongs in the same schedule as the roof-to-wall flashing. Watch for mortar droppings blocking the weeps, flashing that stops behind the brick face instead of extending past it, and weeps later buried by grade, mulch or a patio. How veneer drains is on our brick veneer siding page.
Below 40°F, brick needs cold-weather procedures. The TMS 602 masonry specification, as summarized in Brick Industry Association Technical Note 1, requires heated mixing water or sand, no frozen or iced units, and new work covered for 24 hours. Requirements tighten again below 32°F. Mortar that freezes before it cures doesn't develop its full bond or strength.
Chimneys on New Homes and Additions
A new-home chimney is either masonry laid up from its own footing or a listed, labeled factory-built flue in a framed chase. The part that meets the other trades is the roof joint: step and counterflashing, a cricket behind any chimney more than 30 inches wide, measured parallel to the ridge, that doesn't meet the ridge, and the height rule above. On a factory-built chimney, watch the chase cover: a flat pan holds water and rusts, and the rust streaks down the siding. Ask for one sloped or crowned to shed water, with a drip edge past the chase walls. The rest is on our chimney installation page.
Addition or New Home: Two Different NJ Rulebooks
An addition is home improvement work under New Jersey's consumer rules, which cover "the making of additions" but exclude building a new residence; a new house falls under the New Home Warranty and Builders' Registration Act. The contractor you sign with for an addition must register annually with the Division of Consumer Affairs, and the contract must be written, signed by all parties, and include:
- The contractor's legal name, address and registration number, and a copy of its general liability insurance certificate with the insurer's phone number.
- The total price including finance charges, the principal products and materials, and the start and finish dates.
- Your right to cancel before midnight of the third business day after you receive a copy, in writing by certified or registered mail or in person, with any refund due within 30 days.
If a GC runs your addition and brings us in, your contract carries the GC's number, and you can ask any subcontractor for theirs. Ours is NJ HIC #13VH12696700, listed with our credentials.
A new home, meaning a dwelling unit not previously occupied (units built solely for lease excepted), must be built by a DCA-registered builder, and DCA counts anyone acting as prime contractor on one as a builder. A full teardown and rebuild is generally a new home. The warranty law doesn't cover a new home on a preexisting foundation, or one an owner builds for personal use as their own GC, so get every warranty you're counting on, from each contractor and manufacturer, in writing.
Which Building Code and Permit Rules Apply to Your Project?
New Jersey's adoption of the 2024 International Residential, Building and Energy Conservation Codes, with the 2023 National Electrical Code, took effect August 17, 2026, but a complete permit application with all prior approvals submitted by February 17, 2027 can still be reviewed under the previous edition. Ask your construction official which one governs your permit.
Permits and inspections run under the Uniform Construction Code (N.J.A.C. 5:23). Building or enlarging a structure needs a permit before work starts, so every addition needs one. Replacing the roof covering or siding (polypropylene excepted) on an existing detached one- or two-family home is ordinary maintenance, which generally needs no permit, so re-roofing the old house to match may need no permit of its own, while the addition always does. Your local construction official decides what your job requires.
Before It's Covered: Inspections and a Walk-Through Checklist
On a one- or two-family dwelling, work stops for footing, foundation, utility and mid-point inspections, with a final before the certificate of occupancy. The mid-point covers framing, connections, wall and roof sheathing, and insulation, and is requested in writing at least 24 hours ahead. Ask your construction office whether they need to see sheathing before underlayment and wrap cover it.
After that, cladding hides these details for good. Walk the job, or ask for photos of:
- A kickout wherever a roof eave meets a wall.
- Base flashing along every sidewall, normally step flashing at each shingle course, its vertical leg up behind the wrap.
- House wrap lapped over the flashing, not tucked behind it.
- Drip edge on the rakes as well as the eaves.
- Flashing and weepholes at the base of any brick and over its openings.
In Bergen, Passaic, Essex, Hudson, Morris and Union, an ice barrier at the eaves is a specification choice, not a code requirement, so put the decision and locations in writing. The photos are also your record if a warranty question comes up.
Who Do You Call When a New Roof Leaks?
On a new home, you call the builder, the warrantor under New Jersey's New Home Warranty law. The State Plan's minimum coverage runs one year for workmanship and materials, two for plumbing, electrical, heating and cooling, and ten only for major construction defects, meaning damage to load-bearing parts of the home. DCA's homeowner booklet treats a roof leak as a first-year defect and excludes leaks caused by severe weather, such as ice and snow build-up, high winds or driven rain.
- Notify the builder in writing as soon as you find the leak; the outside deadline is 7 calendar days after that item's warranty expires. DCA recommends certified mail with return receipt, plus a first-class copy.
- Under the State Plan, if the builder hasn't inspected and repaired within 30 days of your notice, you then have 14 days to file with DCA's New Home Warranty Program. Except for emergencies and major structural defects, you can't file until 120 days after the warranty starts. A private plan has its own steps, so check which plan covers your home.
- Don't have an outside roofer fix a warranty leak first. Work by anyone other than the builder or its subcontractors isn't the builder's or the State Plan's responsibility.
We can inspect a leak and photo-document it for your own notice to the builder; the notice and any claim are yours to file. An addition gets no state new-home warranty, because the law excludes remodeled homes, so get the workmanship warranty in writing in your contract and keep the manufacturers' material warranties. Ours is written, with its term stated in our contract; roof warranties in NJ explains the difference.
When Tri-State Isn't the Right Call
Tri-State is the wrong fit in three situations:
- You want one company to build the whole house. Hire a DCA-registered builder, who can bring an exterior trade in.
- Your GC already has roofing and siding subs and the job is on schedule. Switching trades mid-build blurs who owns the joints and the warranty.
- You need framing, insulation, interior finishes, plumbing, electrical or HVAC. Those belong to the builder or GC; our part is the exterior shell.
If you're planning an addition, or you're a builder lining up exterior trades, send the drawings or permit set for a free written estimate scoped to the exterior, ideally before framing, while roof slope and chimney height can still change.
What's Included
- First roofs on new framing, and tie-ins where additions meet the house
- Roof-to-wall flashing and kickouts set before the siding goes on
- Siding over a continuous, shingle-lapped water-resistive barrier
- Brick veneer with base flashing, lintel flashing and weepholes
- Chimneys step- and counterflashed, with a cricket where code needs one
- Gutters and leaders hung on the finished roof edges
New Construction Exteriors — Common Questions
Does Tri-State build new homes?
No. We install the exterior (roofing, siding, masonry and brick veneer, chimneys and gutters) on new homes and additions that someone else is building. In New Jersey, anyone in the business of building new homes must be registered with DCA's New Home Warranty program, and a home improvement registration like ours expressly excludes building a new residence. On a new home we work under the registered builder, who is the warrantor of the house. On an addition we work under whoever is running the job, a general contractor or you.
Who is responsible if the roof on my brand-new home leaks?
The builder is responsible, as warrantor under New Jersey's New Home Warranty law. DCA's homeowner booklet treats a roof leak in a new home as a first-year defect and excludes leaks caused by severe weather, such as ice and snow build-up, high winds or driven rain. Notify the builder in writing as soon as you find the leak; the deadlines and filing steps are in the warranty section on this page. Don't hire an outside roofer to fix it first, because work by anyone other than the builder or its subcontractors falls outside the builder's coverage.
Will the roof on my addition match my existing roof?
It can match in product line and color if both are still made, but usually not in appearance on day one. An older roof has weathered and lost granules, and new shingles won't look the same next to it. The difference may fade somewhat over time and may never fully disappear. Your options are to accept it, re-roof the plane the addition ties into, or re-roof the whole house at the same time. Check the slope first: below 2:12, shingles aren't allowed on the addition roof at all, and it needs a covering rated for low slopes, usually a membrane.
Do I need a separate roofer for my home addition, or does my general contractor handle it?
Either works; what matters is who owns the joint where the new roof meets the existing wall and roof. The roof's step flashing has to go on before the house wrap laps over it and the siding covers it, and against brick the mason's counterflashing laps down over the roofer's step flashing. If your GC hires one company for the roof and another for the siding or brick, ask who installs the step flashing and kickouts, and whether that happens before the siding goes on. One exterior contractor for roof, siding and flashing removes that hand-off. The contractor you sign with must print its NJ home improvement registration number on your contract, and you can ask any subcontractor for theirs.
Can the siding on my addition match my existing siding?
Sometimes, but plan for a visible difference. Vinyl and aluminum profiles and colors have changed over the years and existing siding has faded, so an exact match on an older North Jersey house is often not available. A piece taken from a hidden spot identifies the profile and exposure. The usual answers are the closest current profile with the change falling at an outside corner, reusing siding removed from the wall the addition covers to patch the most visible side, or re-siding the whole house at the same time. Re-siding the old house generally needs no permit of its own; your construction official decides.
What should the contract for my addition's exterior spell out?
Beyond what New Jersey requires in a written home improvement contract (registration number, insurance certificate, total price, principal materials, and start and finish dates), it should spell out the details that are hard to check once they're covered: whether an ice barrier goes in and where; a kickout at every eave-to-wall joint; drip edge at the rakes as well as the eaves; how flashing at brick walls is done; the siding-match plan; which existing roof planes, if any, get re-roofed; and who requests each inspection. Writing these down settles what was supposed to be installed before anyone has to argue about it.
Is ice-and-water shield required by code on a new roof in Bergen, Passaic, Essex, Hudson, Morris or Union?
No. The code requires an ice barrier only where the January average daily temperature is 25°F or less, and DCA identifies that area of New Jersey as Sussex County. In those six counties, a membrane at the eaves is a specification choice rather than a code requirement. Where it's worth specifying anyway: eaves over heated rooms, especially capes with knee walls where ice dams form; valleys; any section between 2:12 and 4:12; and where a new roof ties into the old house or a wall. Put the decision and the locations in the contract.
Does adding a second story or dormer affect my chimney?
It can, so check it at the design stage. A chimney must end at least 2 feet higher than any part of the building within 10 feet, and at least 3 feet above the highest point where it passes through the roof. A new dormer or second story within 10 feet of an existing chimney can leave the stack too short, and extending it is far simpler to plan on drawings than to fix after the roof is framed.
